Whole-home remodeling & additions
Coordinate kitchens, bathrooms, living spaces and additions with one remodeling team, from the overall scope to the final details.
What we coordinate
Decide which rooms are changing, what stays and which decisions affect more than one space. We coordinate layout, kitchen and bathroom work, flooring, lighting and finishes within one project scope. See how rooms came together at Southeast Home and Vizcaya II.

SE Cape House
Proskillz opened the wall between the kitchen and great room and coordinated the trades for a freestanding island. Interior renovation by Proskillz Remodeling, Inc. Cabinetry and countertops by Cabinet Genies, Inc.
See SE Cape House before, during and afterOur process
Know what comes next, who is coordinating it and how the details come together.
Goals, priorities, existing conditions and the way you want the home to live.
Scope, responsibilities, selections and practical expectations before work begins.
Trades, materials, schedule and field work managed under one connected plan.
Final details, walkthrough and a clean closeout that does not fade at the finish line.
Coordinate the whole house
A whole-home renovation connects decisions across rooms. Define the work that must happen together, what can wait and how the household will manage each stage before construction begins.
Start with the rooms, layout changes and existing conditions. Include protection, demolition, connected trade work, materials and finish details, plus permitting or engineering when applicable. Use our remodeling budget planner to prepare; a project-specific quote confirms the actual scope and price.
Map work that crosses room boundaries before choosing a room-by-room order. Flooring, lighting circuits, plumbing and structural changes can connect several spaces. Agree where each phase stops and how later work could affect completed finishes.
Discuss kitchen and bathroom access, dust separation, access routes, material staging and when rooms will be out of use. Confirm living arrangements and the work sequence before demolition; staying in the home may not be practical for every scope.
Build a room-by-room selection list alongside the planned order of work. Identify which cabinet, appliance, fixture and flooring choices need confirmation before ordering or connected trade work. Keep approved selections and delivery updates together, and discuss what must be ready for each stage.
List each room and the work included, then separate product supply from removal, preparation and installation. Check allowances, exclusions and who handles connections and finish repairs. Compare equivalent selections and scope before comparing totals, including the work that connects one room to the next.
Agree how proposed changes will be recorded and approved. Before changed work proceeds, review the scope, price, materials and sequence, including effects on ordered items and completed rooms. Keep a written record of the agreed revision so the project team has the same instructions.
Cape Coral planning note
Whole-home remodels and additions can combine several permit types and inspections depending on structural, electrical, plumbing, mechanical and other work. Identify the changes across rooms before finalizing the permit plan for the project.
The City of Cape Coral publishes an Addition/Remodel application and residential remodel guidance in its Permit Document Center. Requirements vary with the work being performed and with jurisdiction, so the permit plan should follow the defined project rather than assumptions made before the scope is complete.
Choose analytics and advertising separately. You can use our forms with both off and change your choices in the footer.